• a.jpg
  • b.jpg
  • c.jpg
  • d.jpg

As per ICH, WHO and GMP the manufacturing of pharmaceutical finished products requires an updated and fully functional heat ventilation and air conditioning system (HVAC). Swan Pharmaceutical is dedicated and committed to comply with the cGMP and WHO requirements, for this purpose the company have installed a fully automatic and updated HVAC system located on a separate covered floor. There are dedicated units of HVAC system for the different production facilities. We are proud to say that our HVAC system is appreciated by the experts and inspectors from MOH Pakistan.